Contaminants are removed using a dissolved air-in-water solution produced by injecting air under pressure into a recycle stream of clarified DAF effluent. This recycle stream is then combined and mixed with incoming wastewater in an internal contact chamber where the dissolved air comes out of the solution in the form of micron-sized bubbles that attach to the contaminants. The bubbles and contaminants rise to the surface and form a floating bed of material that is removed by a surface skimmer into an internal hopper for further handling.
Selected References
FARA WWTP
New state of the art treatment plant for Fredrikstad og Hvaler
Design Load
Qdim: 2170 m³/h
Qmax: 6600 m³/h
TN: 1500 kg/d
TP: 167 kg/d
BOD: 6200 Kg/d
Technologies
Pumping station
Pre-treatment
MBBR
Dissolved air flotation
CoMag system
Effluent Requirements
TN: 85% removal or 6 mg/l
TP: 95% removal or 0,2 mg/l
BOD: 80% removal or 25 mg/l
Project Data
Awarded: 2022
Completion: 2027
Oppegård Drinking Water Plant
Design Load
Qdim; 750 m³/h
Technologies
Complete rebuilding of the flotation system including rehabilitation and strengthening of the concrete pool. New inlet arrangement with distribution of dispersion water, new baffles in steel, new sludge roller, bottom scraper and new arrangement for emptying sludge.
Project Data
Awarded: 2017
Completion: 2018
UGRA WWTP
New State of the art treatment plant for Ullensaker Municipality
Design Load
PE: 125 000
Qmaxdim: 1 900 m³/h
BOD: 7470 kg/d
TN: 1530 kg/d
Technologies
Pumping station
Pre-treatment
MBBR
Dissolved air flotation
Sand filtration
Effluent Requirements
TN: 70 %removal
TP: 98% removal
BOD: 70% removal or 25 mg/l
Project Data
Awarded: 2020
Completion: 2025
Enga WWTP
Upgrading existing plant for Sandefjord Municipality
Design Load
PE: 103 500
Qmaxdim: 3200 m³/h
BOD: 6210 kg/d
Technologies
Pumping station
MBBR
Dissolved air flotation
Effluent Requirements
TP: 90% removal
BOD: 70% removal or 25 mg/l
Project Data
Awarded: 2018
Completion: 2025
Søbyholmen WWTP
Design Load
PE: 4000
Qmaxdim: 57 m³/h
BOD: 180 kg/d
COD: 360 kg/d
Technologies
Pumping station
Pre-treatment
MBBR
Dissolved air flotation
Sludge dewatering
Effluent Requirements
TP: 90% removal
BOD: 90% removal or 10 mg/l
Project Data
Awarded: 2020
Completion: 2022